Loading...
HomeMy WebLinkAbout0112220 POSHKOSH ON THE WATER .lob Address 1119 OTTER AVE Contractor MERTEN PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner PATRICIA J STEFFENS Category 411 - Residential-Water Heaters No 112220 Create Date 01/05/2005 Plan Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL NG WTR HTR Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $695.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided Issued By Parcel Id # 0802510000 Date 01/05/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1076 COZY LN OSHKOSH WI 54901 - 0000 Telephone Number 231-6795 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.