HomeMy WebLinkAbout0112188-Building (storage tank)
e
OSHKOSH
ON THE WATER
Job Address 2541 W 20TH AVE
CITY OF OSHKOSH
No
112188
BUILDING PERMIT - APPLICATION AND RECORD
Owner
CO OSHKOSH PEPSI COLA BOTTLING
Create Date
12/28/2004
Designer
Contractor
TEl CORPORATION
Category
290 - Miscellaneous (Structures other than buildings)
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 40 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
8 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
Bottling Plant/ Install storage tank at west side of recent addition. 25K Gallon capacity.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
VAN ERT ELECTRIC
Fees: Valuation
$68,000.00
Plan Approval
$0.00 Permit Fee Paid
$268.00 Park Dedication
$0.00
Issued By:
Date 01/04/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1328580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
325 E CHICAGO ST
Agent/Owner
MILWAUKEE
WI 53202 - 0000 Telephone Number
414-291-8850
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: 2541 W. 20TH AVE., PEPSI AMERICAS
PROPERTY OWNER/CONTRACTOR: PEPSIITRIAD ENGINEERING
ZONING: M-3
CONSTRUCTION DATA: 0 New Construction
¡g¡ Addition
0 Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 25,000 GAL SUGAR TANK &
FENCING
COMPLIANCE CHECKLIST
DEFICIENT
DEFICIENT
DEFICIENT
0 Use
0 Lot Width
0 Lot Area
0 Lot Area Per Family
0 Flood Plain
0 Front Yard
0 Front Yard Side Street
0 Rear Yard
0 Side Yards
0 Building Area
0 Parking Standards
0 Off-Street Loading Standards
0 Vision Clearance
0 Transitional Yard Standards
0 Landscape Standards
0 Height
0 Conditions of Approval
0 Compliance with P.C. or
BZA Conditions of Approval
0 Sign age Standards
0 Mechanical Equip. Screening
0 Parking Lot Lighting
COMMENTS:
. NO MECHANICAL EQUIPMENT SCREEING REQUIRED SINCE
THIS IS TANK IS NOT CONSIDERED MECHANICAL EQUIPMENT
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
J6I APPROVED
0 DENIED
Plan Commission Action Required
- Variance(s) Required /~
REVIEWED BY: Matt Tucker V
DATE: 12/27/2004
2003
~
C)
=>
(/)
LL..
0
Z
0
~~
(.)2:
9~
------------------
w
::)
z
w
>
«
-C:
-J-J
0
N
l-
V)
w
3:
-----
---
\
\
\
\
---.,-
w
(J)
~
0
:r:
w
a:::
<t:
~
w
(/)
:::>
0
:r:
w
a:::
«
~
V'3~'v' G30N3.:J
-------"._-----
\
\
\
\
\
\
\
\
\
\
--~
\
-----
\
\
\
z
\
\
\
\
\
\
\
\
\
~
\
\
\
\
\
\
~
\
\
\
\
\
\
\
\
. ------------