HomeMy WebLinkAbout0112183-Plumbing (water heater) CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
JobAddress 1112WNEWYORKAVE Owner 1112WNEWYORKAVENUELLC
Contractor MOREMAN PLUMBING Category 411 - Residential-Water Heaters
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 112183
Create Date 01/03/2005
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Int Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 EyeWash Statn
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
INSTALL WTR HTR
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Parcel Id #
1204110000
Date 01/03/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number
231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.