Loading...
HomeMy WebLinkAbout0112184 BOSHKOSH ON THE WATER .lob.Address 716 OREGON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner 716 OREGON STREET LLC Contractor OWNER Category 232 - Alteration Stores & Customer Service No 112184 Create Date 01/03/2005 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Retail - Professional Service/Install various partition walls to create office, work station areas. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 01/03/2005 Final/O.P. 00/00/0000 Parcel Id # 0300680200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 716 OREGON ST Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.