Loading...
HomeMy WebLinkAbout0112168-Building (fence)OSHKOSH ON THE WATER .lob .Address 2010 MINERVA ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CLASSIC HOMES BY KUBA LTD Contractor CLASSIC HOMES BY KUBA LTD Category 251 - Fences No 112168 Create Date 12/30/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab O Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size ~J Projection I Canopies 0 Signs 0 Use/Nature SFR/Install 74 lin ft of 6' tall cedar fence along east property line (rear.) of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $3,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 12/30/2004 Final/O.P. 00/00/0000 Parcel Id # 1213220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 738 OSHKOSH WI 54903 - 0738 Telephone Number 426-8600 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.