HomeMy WebLinkAbout0112145-Building(~ CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
JobAddress 3051 MOCKINGBIRD WAY Owner DANIEL S NEY/LORI J KUHLOW
Designer Contractor KUHLOW BUILDERS LLC
Category 140 - Interior Remodeling
No 112145
Create Date 12/28/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Remodeling the basement to include a rec room, wet bar, bathroom, office, family room and unfinished storage area. All construction
of Work shall comply with local and state building code requirements.
HVAC Contractor UNKNOWN???
Electric Contractor EFFICIENT ELECTRIC LLC
Fees: Valuation $26,000.00 Plan Approval
Issued By:
Plumbing Contractor UNKNOWN
$0.00 Permit Fee Paid
Permit Voided
$142.00 Park Dedication $0.00
Date 12/28/2004 Final/O.P. 00/00/0000
Parcel Id # 1335220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address W5116 BLUE HERON CT SHERWOOD WI 54169 - 0000 Telephone Number 540-1198
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.