Loading...
HomeMy WebLinkAbout0111472 POSHKOSH ON TIlE WATER Job Address 1125 W LINWOOD AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner DAVID L SCHWARTZ ETAL Category 410- Residential-interior Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink __ Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink Res. Sink I Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker NO 111472 Create Date 11/03/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye WashStatn __ 0 0 0 0 0 0 0 0 0 Use/Nature of Work REPLACE KiT SNK Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $800.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoided] Parcel Id # 1219300200 Date 11/03/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 23%9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.