HomeMy WebLinkAbout0111472 POSHKOSH
ON TIlE WATER
Job Address 1125 W LINWOOD AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DAVID L SCHWARTZ ETAL
Category 410- Residential-interior
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink __
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink
Res. Sink I Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
NO 111472
Create Date 11/03/2004
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 int Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 Eye WashStatn __
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
REPLACE KiT SNK
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Valuation $800.00 Plan Approval $0.00 Permit Fees
Issued By
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] PermitVoided]
Parcel Id #
1219300200
Date 11/03/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH WI 54901 - 2298 Telephone Number 23%9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.