Loading...
HomeMy WebLinkAbout0111478-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 1945 HICKORY LN Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner ASWIN/SANGITA PATEL Category 410- Residential-Interior Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 Loca[Waste 0 Wait. St. 0 Shamp Sink __ Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/VVst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater I Sump Pump 2 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 111478 Create Date 11/03/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap __ 0 Ext Grease Trap 0 RPZ Valve 9 Eye Wash Statn 0 0 0 0 0 0 0 0 0 Use/Nature of Work INSTALL NG WTR HTR & 2-SUMP PUMPS Valuation issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0; 0 0 0 0 0 0 0 0 0 0 0 0 0 $1,200.00 Plan Approval $0.00 Permit Fees $21.00 [] Permit Voided~ Parcel Id # 1526110000 Date 11/03/2004 in the performance of this work, I agree to perform all work pumuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.