Loading...
HomeMy WebLinkAbout0110598-Plumbing (abandon)OSHKOSH ON THE WATER Job Address 2937 SHADOW LN Contractor RADTKE CONTRACTORS INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner BEVERLY E COON Category 401 - Residential-Exterior (laterals) No 110598 Create Date 08/25/2004 Plan Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Sen/Sink 0 Soda Disp 0 Lavatory 0 LndryTray 0 LocalWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZ Valve 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature SFPJ Abandoning the sewer and water lines to the property. of Work Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 Lateral 1 Aband 0 0 0 0 0 0 0 0 0 Lateral 1 Aband 0 0 $150.00 Plan Approval $0.00 Permit Fees $100.00 [] Permit Voided Parcel Id # 1519625400 Date 09/20/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per/~it application within an easement, the City strongly urges the permit applicant to contact the easement botany n_ecec~C~lrY approvals before starting such activity. Signature ~~~ Date Agent~Owner Address 6408 STATE RD 110 WINNECONNE WI 54986 - 0000 Telephone Number (920) 582-4114 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.