HomeMy WebLinkAbout0110540-Plumbing (water heater)OSHKOSH
ON THE WATER
,Job Address 161 W 19TH AVE
Contractor KURT ZENTHER & SONS INC
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner PEGGY S CALDWELL
Category 411 - Residential-Water Heaters
0 Ejector/Grind 0 Dip Well 0 F Prep Sink
0 Water Softner 0 Drink Ftn 0 Serv Sink
0 Local Waste 0 Wait. St. 0 ShampSink
0 Clothes Wshr 0 ice Chest 0 FIr/Wst Sink __
0 Bidet 0 Exam Sink 0 Catch Basin
0 Beer Tap 0 SculrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 PlasterSiRk 0 Standp Rec __
0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 110540
Create Date 09/17/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn _ 0
0
0
Use/Nature
of Work
INSTALL NG WTR HTR
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
CoRn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$450.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit VoidedJ
Parcel Id #
0000000000
Date 09/17/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 2860 OREGON ST
Agent~Owner
OSHKOSH WI 54902 - 0000 Telephone Number 235-1340
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.