Loading...
HomeMy WebLinkAbout0110507-Plumbing (sewer lateral)OSHKOSH ON THE WATER ,Job Address 216 E IRVING AVE Oontractor HOMEOWNER Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 LndryStndp __ Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner THOMAS N/JANE E NINTZEL Category 401 - Residential-Exterior (laterals) 0 Ejector/Grind 0 DipWell 0 F PrepSink 0 Water Softner 0 Drink Ftn 0 ServSink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Clothes Wshr 0 Ice Chest 0 FIr/VVst Sink 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 110507 Create Date 09/15/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int GreaseTrap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work RELAY SANTARY SEWER LATERAL Valuation Issued By Storm Water $1,000.00 Size Material Type # Conn. Type 0 0 0 0 0 Plan Approval $0.00 Permit Fees $50.00 [] Permit Voided j Parcelld # 1000390000 Date 09/15/2004 The undersigned, in applying for a plumbing permit to install plumbing in a single family home owned and occupied as the principle residence of the undersigned, hereby acknowledges, per Wisconsin State Statutes, ss 145.06, that other individuals will not be employed to assist with the work described by this permit. If an individual will be employed to install plumbing the work involved must be covered by a permit issued to a properly licensed Master Plumber. In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Signature ""~.~ ~, ~ ~--~ Date Agent/Owner Address 216 E IRVING AVE OSHKOSH WI 54901 4515 Telephone Number To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity.