Loading...
HomeMy WebLinkAbout0110444-PlumbingOSHKOSH ON THE WATER Job Address 641 639 JACKSON ST Contractor MOREMAN PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 1 Lndry Tray Toilet I Lndry Stftdp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner DYNAMIC PROPERTIES LLC Category 410- Residential-Interior I Ejector/Grind 0 DipWell 0 F Prep Sink 0 Water Softner 0 Drink Ftn 0 ServSink 0 Local Waste 0 Wait. St. 0 ShampSink 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 110444 Create Date 09/07/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work 2 FAMILY REMODEL BATHROOM Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $2,000.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $21.00 [] Permit Voided j Parcel Id # 070180O000 D~e 0~10/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.