Loading...
HomeMy WebLinkAbout0110338-Plumbing (water heater)OSHKOSH ON THE WATER Job Addrass 2512 SHOREWOOD DR Contractor SAMMONS PLUMBING CITY OF OSHKOSH No 110338 PLUMBING PERMIT - APPLICATION AND RECORD Owner EILEEN M RESCHESKE Create Date 09/02/2004 Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 Drink Ftn 0 Sen/Sink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn __ 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work IEPLACE WATER HEATER Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $500.00 Plan Approval $0,00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoided J Parcelld # 1518610300 Date 09/02/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.