Loading...
HomeMy WebLinkAbout0110337 POSHKOSH ON THE WATER ,lob Address 322 N WESTHAVEN DR Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JAY R/MARY L TACK Category 4f 1 - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink __ Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink __ Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater I Sump Pump 0 Dent. Oper. g Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 1'10337 Create Date 09/02/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext GreaseTrap 0 0 RPZ Valve 0 0 EyeWash Statn 0 0 0 Use/Nature of Work KEPLACE WATER HEATER Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $500.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided Parcel Id # 0622230000 Date 09/02/2004 In the per[ormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not per[ormed within two business days from the time the project is ready.