HomeMy WebLinkAbout0110324-Plumbing (garbage disposal)OSHKOSH
ON THE WATER
,JobAddreae 2605 JACKSON ST
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner STEVEN PJNANCY BERTZ
Category 440- Industrial-Interior
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 LndryStndp __
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump __
Site Drain 0 Classrrn Sink
Roof Drain 6 Breakrm Sink
0 Ejector/Grind 0 DipWell 0 F PrepSink 0
0 Water Softner 0 Drink Ftn 0 ServSink 0
0 Local Waste 0 Wait. St. 0 ShampSink 0
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0
1 Bidet 0 Exam Sink 0 Catch Basin 0
0 Beer Tap 0 SculrySink 0 Wash Ftn 0
0 Dent. Oper. 0 Hand Sink 0 Urinal 0
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
No 110324
Create Date 09/02/2004
Plan
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
Use/Nature REPLACE GARBAGE DISPOSAL
of Work
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $300.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Issued By
Parcelld #
1219800000
Date 09/02/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 w. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 23%9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.