HomeMy WebLinkAbout0110289-Plumbing (water heater)OSHKOSH
ON THE WATER
.lob Addreea 608 W LINCOLN AVE
Contractor J RASMUSSEN PLUMBING INC Category
Bathtub 0 Shower 0 Ejector/Grind 0
Whirlpool 0 Floor Drain 0 Water Softner 0
Lavatory 0 Lndry Tray 0 Local Waste 0
Toilet 0 LndryStndp 0 Clothes Wshr 0
Res. Sink 0 Disposal 0 Bidet 0
Bar Sink 0 Dishwasher 0 Beer Tap 0
Water Heater 1 Sump Pump 0 Dent. Oper. 0
Site Drain 0 Classrm Sink 0 Lab Sink 0
Roof Drain 0 Breakrm Sink 9 Sterilizer 0
CITY OF OSHKOSH No 110289
PLUMBING PERMIT -APPLICATION AND RECORD
Owner ALL AMERICAN INVESTMENTS LLC Create Date 08/31/2004
411 - Residential-Water Heaters Plan
Dip Well 0 F Prep Sink 0 Gar Drain 0
Drink Ftn 0 Serv Sink 0 Soda Disp 0
Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
SculrySink 0 Wash Ftc 0 RPZValve 0
Hand Sink 0 Urinal 0 Eye Wash Statn 0
Plaster Sink 0 Standp Rec 0
Surgeons Sink _ 0 Ice Maker 0
ofUSe/Naturework IEPLACE WATER
HEATER
Sanitary Sewer
Storm Sewer
Water Service
Size
Valuation $550.00 Plan Approval $0.00 Permit Fees
Issued By
Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] Permit Voided
Parcelld #
0502510000
Date 09/01/2004
In the performance of this work, I agree to peRorm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement ho]der(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent~Owner
Address 1914 GREENBRIARTRL OSHKOSH WI 54904 - 0000 Telephone Number
920-233-6747
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may
continue if the inspection is not performed within two business days from the time the project is ready.