Loading...
HomeMy WebLinkAbout0110287-Plumbing (water heater)OSHKOSH ON THE WATER ,Job Address 1000 HERITAGE TRL Contractor WATTERS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JOS A BOCHINSKI JR Category 411 - Residential-Water Heaters Ejector/Grind 0 DipWell 0 F Prep Sink __ Water Softner 0 Drink Ftn 0 Serv Sink Local Waste 0 Wait. St. 0 Shamp Sink Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Bidet 0 Exam Sink 0 Catch Basin Beer Tap 0 SculrySink 0 Wash Ftn Dent. Oper. 0 Hand Sink 0 Urinal Lab Sink 0 Plaster Sink 0 Standp Rec __ Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 110287 08131/2004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Iht Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn __ 0 0 0 0 0 0 0 0 0 Use/Nature of Work rEPLACE WATER HEATER Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Corm. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $643.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcelld # 1314650000 Date 09/01/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 118 MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.