HomeMy WebLinkAbout0110287-Plumbing (water heater)OSHKOSH
ON THE WATER
,Job Address 1000 HERITAGE TRL
Contractor WATTERS PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JOS A BOCHINSKI JR
Category 411 - Residential-Water Heaters
Ejector/Grind 0 DipWell 0 F Prep Sink __
Water Softner 0 Drink Ftn 0 Serv Sink
Local Waste 0 Wait. St. 0 Shamp Sink
Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
Bidet 0 Exam Sink 0 Catch Basin
Beer Tap 0 SculrySink 0 Wash Ftn
Dent. Oper. 0 Hand Sink 0 Urinal
Lab Sink 0 Plaster Sink 0 Standp Rec __
Sterilizer 0 Surgeons Sink 0 Ice Maker
No
Create Date
Plan
110287
08131/2004
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Iht Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 Eye Wash Statn __
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
rEPLACE WATER HEATER
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
# Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$643.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Parcelld #
1314650000
Date 09/01/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 118 MENASHA WI 54952 - 0118 Telephone Number
920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.