Loading...
HomeMy WebLinkAbout0110257-Plumbing (water heater)OSHKOSH ON THE WATER 5ob Address 1314 CATHERINE AVE Contractor JOHN D RANSOM CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL D ZEDLER Category 410 - Residential-Interior Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink No 110257 Create Date 09/01/2004 Plan Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/VVst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZ Valve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature ~eplacewater heater. of Work Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $375.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcel Id # 1601O40OOO Date 09/01/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before star~ing such activity. Signature Date Agent/Owner Address W5056 PARADISE LN FOND DU LAC WI 54935 - 0000 Telephone Number 920-922-1987 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.