HomeMy WebLinkAbout0110273-Plumbing (roof drain)OSHKOSH
ON THE WATER
Job Address 375 N EAGLE ST
Contractor BASSETT MECHANICAL
CITY OF OSHKOSH No 110273
PLUMBING PERMIT -APPLICATION AND RECORD
Owner OSH AREA SCHL DIST WEST HIGH Create Date 08/24/2004
Category 440 - Industrial-Interior Plan
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Ctassrm Sink
Roof Drain I Breakrm Sink
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
0 Lab Sink 0 Plaster Sink 0 Standp Ree 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
MOVEROOFDRN
Sanitary Sewer
Storm Sewer
Water Service
size Matartal Type #
Valuation $1.000.00 Plan Approval $0.00 Permit Fees
Issued By
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] Permit Voided
Parcelld #
1608720100
Date 09/01/2004
In the performance of this work, I agree to perform all work pumuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strcegly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 7000 KAUKAUNA WI 54130 - 7000 Telephone Number
800-236-2502==920-
To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.