Loading...
HomeMy WebLinkAbout0110273-Plumbing (roof drain)OSHKOSH ON THE WATER Job Address 375 N EAGLE ST Contractor BASSETT MECHANICAL CITY OF OSHKOSH No 110273 PLUMBING PERMIT -APPLICATION AND RECORD Owner OSH AREA SCHL DIST WEST HIGH Create Date 08/24/2004 Category 440 - Industrial-Interior Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Ctassrm Sink Roof Drain I Breakrm Sink 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Lab Sink 0 Plaster Sink 0 Standp Ree 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work MOVEROOFDRN Sanitary Sewer Storm Sewer Water Service size Matartal Type # Valuation $1.000.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided Parcelld # 1608720100 Date 09/01/2004 In the performance of this work, I agree to perform all work pumuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strcegly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 7000 KAUKAUNA WI 54130 - 7000 Telephone Number 800-236-2502==920- To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.