Loading...
HomeMy WebLinkAbout0110267-Plumbing (water heater)OSHKOSH ON THE WATER · Job Address 2836 FOND DU LAC RD Contractor M P KELLY CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner STONEY BEACH WEST LLC Category 411 - ResidentiakWater Heaters Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn Water Heater I Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrrn Sink _ 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 110267 Create Date 08/31/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Iht Grease Trap __ 0 Ext Grease'lmp 0 RPZ Valve 0 Eye Wash Statn 0 0 0 0 0 0 0 0 0 Use/Nature of Work EPLACE WATER HEATER Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $700.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcel Id # 1413341200 Date 09/01/2004 in the performance of this work, I agree to perform all work pursuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before sta~ng such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH wi 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.