HomeMy WebLinkAbout0110267-Plumbing (water heater)OSHKOSH
ON THE WATER
· Job Address 2836 FOND DU LAC RD
Contractor M P KELLY
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner STONEY BEACH WEST LLC
Category 411 - ResidentiakWater Heaters
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn
Water Heater I Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrrn Sink _ 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 110267
Create Date 08/31/2004
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Iht Grease Trap __
0 Ext Grease'lmp
0 RPZ Valve
0 Eye Wash Statn
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
EPLACE WATER HEATER
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$700.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Parcel Id #
1413341200
Date 09/01/2004
in the performance of this work, I agree to perform all work pursuant to roles governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before sta~ng such activity.
Signature Date
Agent/Owner
Address 665 N MAIN ST OSHKOSH wi 54901 - 4431 Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.