HomeMy WebLinkAbout0110268-Plumbing (toilet)OSHKOSH
ON THE WATER
Job Address 1075 BISMARCK AVE
Contractor M P KEELY
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner PAULA J CUDAHY
Category 410 - Residential-intafior
No ~10268
Create Date 08/31/2004
Plan
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 1 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 PlasterSink 0 Standp Rec 0
R~of Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature ~EPLACED TOILET
of Work
Valuation
Issued By
Size MateHal Type #
SanitarySewer
Stonn Sewer
Water Service
Cone. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$286.68 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Parcel Id #
0608180000
Date 09/01/2004
in the performance of this work, I agree to perform all work pumuant to roles governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5~28 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.