Loading...
HomeMy WebLinkAbout0110268-Plumbing (toilet)OSHKOSH ON THE WATER Job Address 1075 BISMARCK AVE Contractor M P KEELY CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner PAULA J CUDAHY Category 410 - Residential-intafior No ~10268 Create Date 08/31/2004 Plan Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 1 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 R~of Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature ~EPLACED TOILET of Work Valuation Issued By Size MateHal Type # SanitarySewer Stonn Sewer Water Service Cone. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $286.68 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcel Id # 0608180000 Date 09/01/2004 in the performance of this work, I agree to perform all work pumuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5~28 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.