Loading...
HomeMy WebLinkAbout0110270-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 2120 WHITE SWAN DR Contractor M P KELLY CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner SUE E SCHOENWETTER TRUS ET Category 411 - ResidentiaI-Watar Heatem Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Braakrm Sink 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Water Soffner 0 Ddnk Ftn 0 Serv Sink 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Clothes Wshr 0 ice Chest 0 Fir/Wst Silk 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec. 0 Sterilizer 0 Surgeons Sink 0 Ice Maker Use/Nature --PLACE WATER HEATER of Work No 110270 Create Date 08/31/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ex[ Grease Trap __ 0 RPZ Valve 0 Eye Wash Statn 0 0 0 0 0 0 0 0 0 Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $245.00 Plan ApProval $0.00 Permit Fees $20.00 [] Permit Voided Parcel Id # 1523190000 Date 09/01/2004 In the performance of this work. I agree to perform all work pursuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line ~at 236-5128 noting the Address, Permit Number, Type Of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project Is ready.