HomeMy WebLinkAbout0110271-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 1935 FABRY ST
Contra~or M P KELLY
CITY OF OSHKOSH No 110271
PLUMBING PERMIT - AP PLICATION AND RECORD
Owner DUANE M SPECHT/DORA GREUNKE Create Date 08/31/2004
Category 411 - Residential-Water Heaters Plan
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
Use/Nature REPLACE WATER HEATER
of Work
Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
Water Softner 0 Drink Ftn 0 Ser~ Sink 0 Soda Disp
Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Iht Grease Trap
Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve
Dent. Oper. 0 Hand Sink 0 Udnal 0 Eye Wash Statn
Lab Sink 0 Plaster Sink 0 Btandp Rec 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0
0
0
0
0
0
0
0
Valuation
Issued By
$645.00
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
~/ater Service 0
0
0
0
0
Plan Approval $0.00 * Permit Fees $20.00 [] PermitVoided
In the performance of this work, I agree to perform all work pumuant to rules goveming the described construction.
While the City of Oshkosh has noauthodty to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant ti~ contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 665 N MAIN ST
Agent~Owner
OSHKOSH
WI 54901 -4431 TelephoneNumber 231-1750
Parcel Id #
1412360000
Date 09/01/2004
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we Will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.