Loading...
HomeMy WebLinkAbout0110991-Plumbing (interior)OSHKOSH ON THE WATER Job Address 3120 WHITE TAIL LN Contractor WATTERS PLUMBING Bathtub 4 Shower Whirlpool 0 Floor Drain Lavatory 12 Lndry Tray Toilet 8 LndryStndp __ Res. Sink 4 Disposal Bar Sink 0 Dishwasher Water Heater 4 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner WAUKAU LLC Category 440 - Industhal-lntefior 4 Ejector/Grind 0 Dip Well 0 F Prep Sink __ 5 WaterSoffner 0 DrinkFtn 0 ServSink 0 Local Waste 0 Wait. St. 0 ShampSink __ 4 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ 4 Bidet 0 Exam Sink 0 Catch Basin __ 4 Beer Tap 0 $culrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 110991 Create Date 10/08/2004 Plan C6-123-0904-P 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 4 Use/Nature of Work 4 UNIT Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $17,980,00 Plan Approval $0,00 Permit Fees $399.00 [] Permit VoidedI Parcel Id # Date 10/08/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you peRorm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 'i 18 Agent/Owner MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.