HomeMy WebLinkAbout0110991-Plumbing (interior)OSHKOSH
ON THE WATER
Job Address 3120 WHITE TAIL LN
Contractor WATTERS PLUMBING
Bathtub 4 Shower
Whirlpool 0 Floor Drain
Lavatory 12 Lndry Tray
Toilet 8 LndryStndp __
Res. Sink 4 Disposal
Bar Sink 0 Dishwasher
Water Heater 4 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WAUKAU LLC
Category 440 - Industhal-lntefior
4 Ejector/Grind 0 Dip Well 0 F Prep Sink __
5 WaterSoffner 0 DrinkFtn 0 ServSink
0 Local Waste 0 Wait. St. 0 ShampSink __
4 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
4 Bidet 0 Exam Sink 0 Catch Basin __
4 Beer Tap 0 $culrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 Plaster Sink 0 Standp Rec __
0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 110991
Create Date 10/08/2004
Plan C6-123-0904-P
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
4
Use/Nature
of Work
4 UNIT
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$17,980,00 Plan Approval $0,00 Permit Fees $399.00 [] Permit VoidedI
Parcel Id #
Date 10/08/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you peRorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address PO BOX 'i 18
Agent/Owner
MENASHA
WI 54952 - 0118 Telephone Number
920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.