HomeMy WebLinkAbout0111090-Plumbing (laterals)OSHKOSH
ON THE WATER
Job Address 3110 WHITE TAIL LN
Contractor 4 WAY CONSTRUCTION
CITY OF OSHKOSH No 111090
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WAUKAU LLC Create Date 05/07/2004
Category 401 - Residential-Exterior (laterals) Plan
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain
0 WaterSoffner 0 Drink Ftn 0 ServSink 0 Soda Disp
0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
0
0
0
0
0
0
0
Use/Nature
of Work
NEW 4 UNIT
Size Material Type # Conn. Type
Sanitary Sewer 6" Plastic Lateral 1 New
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 2" Plastic Lateral 1 New
0
0
0
0
Valuation $2,500.00 Plan Approval $0.00 Permit Fees
Issued By
$20.00 [] PermitVoidedI
Parcel Id #
Date 10/13/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to 9ecure,~. n~c_~s~y approvals before starting such activity.
~ Agent/Owner
Address P.O. BOX 133 BERLIN WI 54923 - 0133 Telephone Number 920-361-1403
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.