Loading...
HomeMy WebLinkAbout0111012-Plumbing CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 326 W SOUTH PARK AVE Owner MARY J MERTZ Contractor M P KELLY Category 410- RosidentiaMnterior Bathtub I Shower 0 Ejector/Grind 0 DipWell 0 F PrepSink __ Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink Lavatory 1 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet I LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 111012 Create Date 10/08/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work REMODEL BATHROOM Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $3,800.00 PlanApproval $0.00 Permit Fees $21.00 [] PermitVoide~I Issued By Parcelld # 0904050000 Date 10/08/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the Ci[y strongly urges the permit appliosnt to contact the easement holder(s) and to secure any necessary approvals before s[arting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.