HomeMy WebLinkAbout0111012-Plumbing CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 326 W SOUTH PARK AVE Owner MARY J MERTZ
Contractor M P KELLY Category 410- RosidentiaMnterior
Bathtub I Shower 0 Ejector/Grind 0 DipWell 0 F PrepSink __
Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink
Lavatory 1 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink __
Toilet I LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 111012
Create Date 10/08/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Iht Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
REMODEL BATHROOM
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $3,800.00 PlanApproval $0.00 Permit Fees $21.00 [] PermitVoide~I
Issued By
Parcelld #
0904050000
Date 10/08/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the Ci[y strongly urges the permit appliosnt to contact the
easement holder(s) and to secure any necessary approvals before s[arting such activity.
Signature Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH WI 54901 - 4431 Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.