HomeMy WebLinkAbout0111016-Plumbing (water heater)OSHKOSH
ON THE WATER
.Job Address 2345 MOUNT VERNON ST
Contractor M P KELLY
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner KAY R WOLFF
Category 4tl - Residential-Water Heaters
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No
Create Date
Plan
111016
10/0812004
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Iht Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 Eye Wash Statn __
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
REPLACED NG WTR HTR
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
Valuation $662.00 Plan Approval $0.00 Permit Fees
Issued By
# Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] PermitVoided J
Parcelld #
1517240000
Date 10/08/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pady, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH WI 54901 - 4431 Telephone Number 231-1750
TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.