Loading...
HomeMy WebLinkAbout0111016-Plumbing (water heater)OSHKOSH ON THE WATER .Job Address 2345 MOUNT VERNON ST Contractor M P KELLY CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner KAY R WOLFF Category 4tl - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 111016 10/0812004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Iht Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn __ 0 0 0 0 0 0 0 0 0 Use/Nature of Work REPLACED NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type Valuation $662.00 Plan Approval $0.00 Permit Fees Issued By # Corm. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoided J Parcelld # 1517240000 Date 10/08/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pady, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.