Loading...
HomeMy WebLinkAbout0111015-Plumbing (disposal)OSHKOSH ON THE WATER JobAddress 90 COVE LN Contractor M P KELLY Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Owner THOMAS/SHIRLEY WYMAN Catagory 410 - Residential-Interior 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Water Softner 0 Drink Ftn 0 ServSink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 1 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 111015 10/08/2004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap __ 0 RPZ Valve 0 EyeWash Statn 0 0 Use/Nature of Work REPLACED DISPOSER Sanitary Sewer Storm Sewer WatarSe~ice Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $386.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Issued By Parcelld # 1415390000 Date 10/08/2004 In the pen<ormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.