Loading...
HomeMy WebLinkAbout0110938-Plumbing (repair)OSHKOSH ON THE WATER ,Job Address 1228 W 5TH AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH No 110938 PLUMBING PERMIT - APPLICATION AND RECORD Owner WILLIAM MOP, ASH Create Date 10/04/2004 Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 LndryStndp __ Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Iht Grease Trap __ 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn __ 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work REPAIR WTR SERV Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 Lateral 1 0 0 Repai~ $600.00 Plan Approval $0.00 Permit Fees $50.00 [] Permit Voided Parcel Id # 0609880000 Date 10/07/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgentJOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.