HomeMy WebLinkAbout0110950-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 1880 CLIFFVIEW CT
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH No 110950
PLUMBING PERMIT - APPLICATION AND RECORD
Owner LOWELL A/CHERYL STARR Create Date 10/07/2004
Category 411 - Residential-Water Heaters Plan
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
Lavatory 0 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
Toilet 0 LndryStndp 0 Clothes Wshr 0 ice Chest 0 FIr/Wst Sink 0 Int Grease Trap __
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZ Valve
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statu __
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Natura
of Work
NG WTR HTR
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conm Type
0
0
0
0
0
0
0
Valuation $800.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided~
Issued By
Parcel Id #
1524960000
Date 10/07/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231~9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.