HomeMy WebLinkAbout0110955-Plumbing (studor vent on lav)OSHKOSH
ON THE WATER
Job Address 1430 KNAPP ST
Contractor SAMMONS PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 1 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump __
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner LESLIE J/ELIZAB FRANK
Category 410 - Residential-Interior
0 Ejector/Grind 0 Dip Well 0 F Prep Sink __
0 Water Softner 0 Drink Ftn 0 Serv Sink
0 Local Waste 0 Wait. St. 0 Shamp Sink
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink
0 Bidet 0 Exam Sink 0 Catch Basin
0 Beer Tap 0 SculrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 Plaster Sink 0 Standp Rec __
0 Sterilizer 0 Surgeons Sink . 0 Ice Maker
No 110955
Create Date 10/07/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
STUDOR VT ON LAV
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
# Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$150.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided
Parcelld #
1306690000
Date 10/07/2004
In the performance of this work, I agree to perform ali work pumuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
AgentJOwner
Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the Cequest is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.