Loading...
HomeMy WebLinkAbout0110955-Plumbing (studor vent on lav)OSHKOSH ON THE WATER Job Address 1430 KNAPP ST Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 1 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump __ Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner LESLIE J/ELIZAB FRANK Category 410 - Residential-Interior 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ 0 Sterilizer 0 Surgeons Sink . 0 Ice Maker No 110955 Create Date 10/07/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work STUDOR VT ON LAV Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Corm. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $150.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided Parcelld # 1306690000 Date 10/07/2004 In the performance of this work, I agree to perform ali work pumuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgentJOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the Cequest is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.