Loading...
HomeMy WebLinkAbout0110919-Plumbing (fixtures)OSHKOSH ON THE WATER JobAddress 436 BOWEN ST Contractor KOCH PLUMBING Bathtub 2 Shower Whirlpool 0 Floor Drain Lavatory 2 Lndry Tray Toilet 2 Lndry Stndp Res. Sink 2 Disposal Bar Sink 0 Dishwasher Water Heater 2 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH No PLUMBING PERMIT -APPLICATION AND RECORD Owner LEE J TRITT Category 410- Residential-Interior 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Local Waste 0 Wait. St. 0 Shamp Sink 2 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 110919 Create Date 10/04/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 0 Use/Nature of Work 2 FAMILY PLUMBING REPLACEMENT Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 $10,000.00 Plan Approval $0.00 Permit Fees $84.00 [] Permit Voided Parcelld # 1101120000 Date 10/06/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before staking such activity. Signature Date Agent~Owner Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.