Loading...
HomeMy WebLinkAbout0112041 POSHKOSH ON THE WATER .lob Address 126-130 STATE ST Contractor ZELINSKI PLUMBING Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 0 Lavatory 2 Lndry Tray 0 Toilet 2 Lndry Stndp 0 Res. Sink 1 Disposal 0 Bar Sink 0 Dishwasher 1 Water Heater 0 Sump Pump 0 Site Drain 0 Classrm Sink 0 Roof Drain 0 Breakrm Sink 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner FREDRICKJSPERLINGREVTRUST Category 440- Industrial-Interior No 112041 Create Date 12/17/2004 Plan Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work OFFICE TENANT ALTERATIONS Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $1,500.00 Plan Approval $0.00 Permit Fees $42.00 ~ Permit Voided Issued By Parcel Id # 0800350000 Date 12/17/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1026 BRIGHTON DR MENASHA WI 54952 - 0000 Telephone Number 729-9295 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.