HomeMy WebLinkAbout0110023-Plumbing (remodel #2)OSHKOSH
ON THE WATER
Job Address 135 CHURCH AVE
Contractor D.R. HANSEN PLBG.
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner D & M RENTALS LLC
Category 410- Residential-Interior
Bathtub I Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink --
Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink
Lavatory 1 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __
Toilet 1 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 110023
Create Date 08/16/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
IREMODLE BATHROOM "UNIT 2"
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$2,000.00 Plan Approval $0.00 Permit Fees $21.00 [] Permit VoidedI
Parcel Id #
0701400000
Date 08/16/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 55 KNAPP ST OSHKOSH WI 54902 - 0000 Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.