Loading...
HomeMy WebLinkAbout0109963-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 1125 EVANS ST Contm~or M P KELLY CITY OF OSHKOSH PLUMBING PERMIT- APPLICATION AND RECORD Owner DAVID NMARCELL BEDORE LIFE ESTATE Category 411 - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 ServSink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater I Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 109963 Create Date 08/12/2004 Plan 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 EyeWash Statn 0 0 0 0 0 0 0 0 0 Use/Nature of Work REPLACED NG WTR HTR Sanitary Sewer Storm Sewer Water Service Valuation $698.00 Plan Approval Issued By Size Material Type # $0.00 Permit Fees Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided Parcel Id # 1109650000 Date 08/12/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessaw approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 23%1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.