Loading...
HomeMy WebLinkAbout0109940-Plumbing (interior)OSHKOSH ON THE WATER Job Addraee 3970 SANDHILL CT Contractor LARRY HANSEN PLBG CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner CLASSIC HOMES BY KUBA LTD Category 410 - Residential-Interior No 109940 Create Date 08/1t/2004 Plan Bathtub 1 Shower Whirlpool '] Floor Drain Lavatory 6 Lndry Tray Toilet 4 Ledry Stndp Res. Sink 1 Disposal Bar Sink 0 Dishwasher Water Heater t Sump Pump Site Drain 0 Ciassrm Sink Roof Drain 0 Breakrm Sink Use/Nature of Work 2 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 I Water Soffner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 1 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 I Clothes Wshr 0 Ica Chest 0 FIr/VVst Sink 0 Iht Grease Trap 0 I Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 1 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 I Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash State 0 0 Lab Sink 0 Plaster Sink 0 StandpRec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 NSFR Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $10,690.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $154.00 [] Permit Voided~ Parcel Id # 1281180000 Date 08/11/2004 In the performance of this work, I agree to perform all work pumuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement mst/ictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address N-1044 TOWER ViEW DR Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-6863 TO schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the proJect is ready.