Loading...
HomeMy WebLinkAbout0109768-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 421 STANLEY AVE Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH No 109768 PLUMBING PERMIT - APPLICATION AND RECORD Owner MR/MRS JEFFREYTYRIVER Create Date 08/03/2004 Category 411 - Residential-Water Heaters Plan Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext GreaseTrap 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Res 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL NG WTR HTR Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $550.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided Parcelld # 1209130000 Date 08/04/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construc[ion. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pe[form the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.