HomeMy WebLinkAbout0109775 P~ CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2805 STONEY BEACH LN Owner JOEL E/LAURIE LUEPKE
Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0
Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
No 109775
Create Date 08/04/2004
Plan
Gar Drain 0
Soda Disp 0
Coffee Maker 0
lat Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
Use/Nature
of Work
INSTALL NG WTR HTR
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Issued By
Parcel Id #
1414800000
Date 08/04/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starfing such activity.
Signature Date
Agent/Owner
Address 522W. MURDOCKAVE OSHKOSH WI 54901 -2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.