Loading...
HomeMy WebLinkAbout0109775 P~ CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2805 STONEY BEACH LN Owner JOEL E/LAURIE LUEPKE Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 No 109775 Create Date 08/04/2004 Plan Gar Drain 0 Soda Disp 0 Coffee Maker 0 lat Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Use/Nature of Work INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Issued By Parcel Id # 1414800000 Date 08/04/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starfing such activity. Signature Date Agent/Owner Address 522W. MURDOCKAVE OSHKOSH WI 54901 -2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.