Loading...
HomeMy WebLinkAbout0109777-Plumbing (water heater)OSHKOSH ON THE WATER ,lob Address 1060 W 5TH AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner WILLIAM F SEYER LIFE ESTATE Category 411 - Residential-Water Heatem No 109777 Create Date 08/04/2004 Plan Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink Toilet 0 Lndry Stndp 0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Deer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker Use/Nature of Work 0 Gar Drain 0 Soda Disp 0 Coffee Maker Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 0 INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided~ Issued By Parcelld # 0606640000 Date 08/04/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE Agent]Owner OSHKOSH W_L 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspect[on (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.