Loading...
HomeMy WebLinkAbout0109784-Plumbing (kit sink/disposal)OSHKOSH ON THE WATER ,Job Address 2015 HICKORY LN Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner ROBERT S PICKERING Category 410 - Residential-Interior Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink Toilet 0 Lndry Stndp 0 Clothes Wshr 0 ice Chest 0 FIr/Wst Sink Res. Sink 1 Disposal 1 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 ice Maker No Create Date Plan 109784 08/04/2004 Gar Drain Soda Disp Coffee Maker Iht Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Use/Nature of Work INSTALL KIT SNK & DISPOSAL Valuation Issued By Sani~rySewer Storm Sewer Water Service Size Material Type # $900.00 Plan Approval $0.00 Permit Fees Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoidedJ Parcelld # 1526150000 Date 08/04/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessaw approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE /kgent2Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.