Loading...
HomeMy WebLinkAbout0109790-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 426 AMHERST AVE Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner EARL J/JANE E HUTCHINSON TRUST Category 411 - Residential-Water Heaters 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink __ 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent·Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 109790 · Create Date 08/04/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work iNSTALL NG WTR HTR Valuation Issued By Sani~Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $500.00 Plan Approval $0.00 PermitFees $20.00 [] PermitVoidedI Parcel Id # 0701960000 Date 08/04/2004 In the peRormance of this work, I agree to perform all work pumuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgentJOwner Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.