HomeMy WebLinkAbout0112006-Building (roof/siding) � CITY OF OSHKOSH No ��2oos
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1318 GRAHAM AVE Owner FRANK S PtOTTER ETAL Create Date 12/15/2004
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan SC��.
fl �O m�
Type � Building � Sign � Canopy � Fence � Raze ,-
Zoning Class of Const: Size ��
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
--- --- -
Use/Nature SFR AFTER THE FACT/Tear off and replace existing roofing on house. Remove slate siding on house and install vinyl. Replace gutters
of Work &downspouts.*NO STRUCTURAL WORK
I
��
i
�I �
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $12,000.00 Plan Approval $0.00 Permit Fee Paid $184.00 Park Dedication $0.00
Issued By: �� Date 12/15/2004 Final/O.P. 00/00/0000 :
Permit Voided Parcel Id# 1600820000
�__. __
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of hkosh has authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this er it appli ion it 'n an easement,the City strongly urges the permit applicant to contact the easement :
holder(s)and to s re any ssa provals before starting such activiry.
Signature v Date \Z..�'�b�
t-�-
AgenUOwner
Address Oshkosh WI 54901 - 0000 TelephoneNumber �{2�-rj4�Z
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.