HomeMy WebLinkAbout0112009-BuildingOSHKOSH
ON THE WATER
.lob Address 1413 OAK ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVE J/JULIA M BINDER
Contractor STANLEY LEACH-BUILDER
Category 140 - Interior Remodeling
No 112009
Create Date 12/15/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Remodeling the bathroom to install new fixtures. The walls will only be opened by the tub area. Installing a new window (same size and
of Work location) and exhaust fan.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
CUMINGS ELECTRIC INC
Plumbing Contractor K KELLY INC
$3,000.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$32.00 Park Dedication $0.00
Date 12/15/2004 Final/O.P. 00/00/0000
Parcel Id # 1508840000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5099 SHERMAN RD OSHKOSH WI 54901 - 9755 Telephone Number
235-2530
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.