HomeMy WebLinkAbout0110034-Electric (yard post light)OSHKOSH
ON THE WATER
Job Address
Contractor
Service
Volts
Amps
CITY OF OSHKOSH No 110034
ELECTRIC PERMIT - APPLICATION AND RECORD
127 BROCKWAY AVE Owner JAY G/ANGEL& S STENGEL Create Date 08/17/2004
HOMEOWNER Category 612- Residential-Single FamilyAddition/R Plan
E~) New O Change (~ Temp · N/A Type (~ Overhead (~ Underground
Circuits 0 Fixtures 0
0 Switches 0 Receptacles 0
Appliances
Use/Nature of SFR / Installation of a post light in the front yard (reviewed the installation with the owner
Work
iFs~eu~ d; ;: u a t i i~j~~a n A p p r o v a I
~-"~ ' [] Permit Voided
Permit Fee Paid $20.00
Date 8/17/04
Parcel Id # 1401660000
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur~c~aw approvals before~ such activity.
Signature ~" ~"~'"-~- E'~-~ ~ ~ Date
Agent/Owner
Address OSHKOSH WI 5490- 6943 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.