Loading...
HomeMy WebLinkAbout0111982-HVAC (furnace; a/c) 111982 CITY OF OSHKOSH No OSHKOSHHVAC PERMIT - APPLICATION AND RECORD ON THE WATER CLARENCE M PARSONS Job AddressOwner 1850 NORTHPOINT ST Create Date12/13/2004 ContractorPREMIUM AIR INCCategory500 - Residential-Heating & VentilatingPlan Oil üü Electric üü GasSolarSolid Fuel New üü ReplaceOther System üü Forced AirRadiantSteamA/CVent ElectricHot WaterSuppl.Con. Burner Chimney TypeChimney AChimney BDirect VentNot Applicable Heat LossAs ApprovedExistingNot ApplicableValue0 As Per PlanVariableOther BTU RateValue Use/Nature SFR/ Replace furnace and A/C - EIV provided by Premium Air, No Chimney liner being installed.Where an appliance is permanently of Work disconnected from an existing chimney or vent (C/V), the C/V shall be resized as necessary to control flue gas condensation in the interior of the C/V and to provide the appliance or appliances served with the req. draft. Plan Approval$0.00 Fees: Valuation$5,421.65Permit Fee Paid$87.50 Issued By:Date12/13/2004 Permit Voided Parcel Id #1521850000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner AddressN3225 HWY 15HORTONVILLETelephone Number920-982-3323 WI54944-0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.