HomeMy WebLinkAbout2025-08-18 - 2550 Clarville RdDocument Nu,
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Title
DOC#.1.9:5-0637
SUSAN SNYDER
WIN.NEBAGO COUNTY, WI
The. City of Oshkosh; the' Governing Body; and United Cooperative, the Property owner, RECORDED ON'
along with their successors and assigns,. are the parties to this Agreement.:' The purpose of 08/ 18/ 2025-10' 33. AM
this'Agreement is:to ensure -adequate storm water drainage facilities for the Property RECORDING FEE' 30.00
described in this Agreement in. connection with the surrounding public storm water '
facilities The consideration for this Agr eement includes the City's approval of the PAGES:. 11
development on the Property., Additional consideration includes the Property owner's
clearer,understanding of storm water drainage obligations for the Property,. and the
Governing Body's assurance that the storm water -drainage issues relating to the Property
can be more easily achieved through.this Agreement. Recording Area
[0shkosh,
& Return Address:
CURRENT PROPERTY OWNERS SUBJECT TO THIS AGREEMENT: osh City Attorney's Office
ox 1130
U.nited.Cooperative '. . WT.549034130
N7160 Raceway RD Tax Parcel Numbers:..
Beaver Dam, W153916, 91347250000
GOVERNING BODY: City of Oshkosh
PROPERTY SUBJECT TO THIS AGREEMENT'
The Property subject to this Agreement is located in the City -of Oshkosh, Winnebago County, and is more particularly described as
follows:
LEGAL DESCRIPTION ATTACHED AS EXHIIBIT "A"
GRADING AND DRAINAGE PLAN
The Property must always comply with and conform to the grading and drainage plan approved by the City. With the recording of this
Agreement, the grading and drainage plan along with the terms of this Agreement will be a covenant.attached to the Property -that
benefits the Property owner, as may change .over time, but the covenant also reflects an interest of the City as a storm water utility and
governmental unity in the Property's stormwater facilities and features. The -approved grading and drainage plan may be amended or
modified from time. to time after consultation with the Property owner, based on changed circumstances -or request by the Property
owner. Compliance will be evaluated according to the most current approved plan. A small-scale version of the current grading and
drainage plan is attached as Exhibit "B" for identification and reference purposes.- The.full-scale grading and. drainage plan is on file
for, review with the City Department of Public Works, and will be used to provide -grading and drainage criteria and -to govern
compliance and any disputes.
I �W 011_�
The three (3) primary. purposes of this. Agreement:
1) Notify the. Property owner, as well as anyone interested in or connected to. the Property that the Property is subject to this Agreement
and.Chapter 14 of the.Oshkosh Municipal Code, as amended, and .that any owner of the Property assumes these obligations; and,
2),Identify.specific "storm water facilities that currently exist on the Property, or may be, constructed or installed in the future; and,
3) Describe the minimum responsibilities for maintaining the Property's. approved storm water management facilities, and grading and
drainage plan.
RESTRICTIONS.
In:addition.to compliance with the: grading and drainage plan,.the Property is also_subjeet to all aspects of the Municipal Code,
including storm water management requirements, as may amended, which are currently located in Chapter 14 of the Municipal
Code,.but may renumbered or relocated from time.to time. The storm water management requirements of the Municipal Code
1
June 18, 2025
�1
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
change from time.totime, with the Property owner receiving public notice as required by law. Compliance with changing requirements
is subject:to applicable law:
RESPONSIBLE PARTIES
. The owners) ofthe Property- jointly and severally if, concurrently having more than one owner, are responsible for maintaining the
Property in the manner in Agreement: The benefits, and. burdens. of this Agreement are attached to and run with the land,_
and so also apply to heirs, successors m'mterest, and assigns, The Property owner's responsibilities. include maintaining- approved,
vegetation, grading, drainage, and storm water facilities on the Property.
STORM WATER FACILITIES.
The Property's storm water facilities consist of:
1. Storm- Sewer;
2. Catch Basins; and
3. Wet Ponds.
-INSPECTION-AND MAINTENANCE
All storm -water facilities. and components of the storm water system shall.be inspected at least semiannually, once in the Spring and
once in. the Fall, or more often if required bylaw. The. Property's :storm water drainage- system -Must also be inspected after major
storm events, which.for purposes of this Agreement are those events with an accumulation of one-half (1/2) inch within 24 hours prior
to the.site:having a minimum of 70% stabilization, and An event with. an accumulation of one and one-half (1'/2) inches within 24 hours
after the site has a minimum of 70%stabilization. The storm water facilities and grading and drainage scheme must be maintained as
designed in order to achieve the desired storm water drainage objectives. Therefore; maintenance and repairs must be performed
expeditiously when -system deficiencies are identified. The existence of soil erosion, clogged or damaged inlets. and/or pipes, excessive
sediment loads within the basin and/or biofilter, rilling of side slopes, and other damaged features of the stormwater system are
examples of items requiring,maint'enance or. repair -work. Material removed from the basin or.biofilter-may require special. handling
dependent upon current Wisconsin Department of Natural Resources disposal practices.
If a biofilteris- installed/constructed, then biofiltermaintenance activities include: remove coarse and gravel sediment that has
accumulated; maintaining proper level. of mulch; inspecting surface and repair eroded areas; inspect filter strip rip -rap and repair as
needed; inspect energy dissipator rock or grass inlet areas; inspect overflow structures; replace filter bed; -inspect perforated'pipe under
drain; remove litter and debris; water, plants; replace dying plants; and replace vegetationwhen necessary.. Biofilter inspection and
maintenance requirements applicable to the Property will change as the. rules enforced by the Governing Body change. -
If a wet basin is.installed/constructed;-then dredging operations are required -to remove the excess sediment when the.depth of water in .
the wet detention -basin diminishes below three feet causing the efficiency of the detention basin to decrease. The storm water
detention basin(s):must.retain.the safety shelf after dredging. Damage.to the safety. shelf or detention basin liner must be repaired to
preserve the safety and operation of the facilities.
If a dry basin and/or swale is installed/constructed, then dry basin and swale. maintenance includes removal of trash and debris, .
repairing erosion, maintaining vegetation, and dredging when necessary.
The examples of maintenance activities that are identified.above are not intended to be complete. The minimum information required
to .be viewed as a guideline for potential maintenance or repair activities is.identified in the. Inspection and Maintenance. Logs attached .
as Exhibit "C". The -Property owner -shall; upon request, make available for inspection all maintenance records to the City's
Department of Public Works, or any agent of the City, during the life. of the system.
2
June 18, 2025 -
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
PROHIBITIONS .
Mowing in buffer areas, detention basin banks and drainage ways shall be minimized in order to maximizefiltration of runoff. If
. .
occasional mowing is necessary, the mowing height must not be less'thau six inches. Applications of fertilizers, herbicides, pesticide
or other chemical.applications are prohibited in.buffer areas, on detention basin.banks and along drainage ways.
COMPLIANCE
1, The Property benefits from a properly maintained grading and drainage plan.as well as properly maintained storm water
facilities: In the event the Property owner fails to perform any obligation related to this Agreement; the City of Oshkosh may
to.enter the private Property to inspect, maintain, repair,, reconstruct, and/or modify any component of the approved grading
and. drainage plan or storm water facility.. The City has no duty to take such action but may do'so at its discretion.
2. . The Property owner is entering into this storm water operation and maintenance Agreement -primarily so that they comply
withlocal and state�storm water rules and regulations. In addition to achieving compliance with rules and regulations, the
Property owner's compliance, with this Agreement may result in the receipt of local storm water credits. In the event the _ -
Property owner fails to materially comply with the terms of this Agreement, the City reserves the right to deny or suspend any
requestedstorm water credits until the noncompliant issue is resolved to the City's.satisfaction. .Upon achieving,compliance,
storm water credits may be reinstated but they shall not be granted retroactively...
3. The remedies described herein intended to achieve compliance are notexclusive, and may be cumulative. The.City may
. utilize one or more lawful actions it deems appropriate to enforce this Agreement and/or the Municipal Code.
4. The Property owner grants to the City of Oshkosh a limited, nonexclusive easement in perpetuity over the Property for the..
purpose of discretionary inspections and corrections of grading and drainage plan deficiencies. The City of .Oshkosh will use
only -that part -of the Property reasonably. necessary.to allow the inspection, maintenance, and/or repair of the approved grading
and.drainage plan or any storm water facility.
5. The City may elect, but is not required, to perform storm water.maintenance or repairs on the Property. If the City exercises
this discretion, then all associated costs for performing this work and enforcing this Agreement and/or storm water
management requirements of Chapter 14 of the Municipal Code, as may be amended, renumbered, or moved, from time to .
time, are subject to reimbursement from Property owners, jointly and severally, or through encumbrances on the Property
itself.. Reimbursement remedies, includeplacing an encumbrance against the Property as a Special Charge for Current
Services pursuant to.Sec. 66.0627 Wisconsin Statutes, as amended, or.through other methods to collect directly from the
Property owner as allowed by law at the City's discretion. Any Special Charge for Current. Services shall be.a lien on the
Property and shall be collected.with the real.estate taxes. Notices. of such charges shall be provided as required by law.
6.. 'The storm water management facilities and this Agreement are for the benefit of the Property and the City of Oshkosh. This
Agreement.is not intended to. benefit other persons and entities, and there are, no third-party.b.eneficiaries.
RECORDING -..
This. agreement shall be recorded with the land records of the Winnebago County,. Wisconsin, Register of Deeds. United Cooperative,
shall bear the cost of recording this document:.
AMENDMENTS -
Amendments to this Agreement must be in writing in a form acceptable for recording by the. Winnebago County Register of Deeds..
SIGNATURES ON FOLLOWING PAGE:
3
CITY OF OSHKOSA
STORMWATER MANAGEMENT FACILITY. .
_ MAINTENANCE AGREEMENT
Document Numb2L____jl Document Title .
For the Owner/Develoaer:
UNITED COOPERATIVE
way -
Managing Member
Print Name
STATE OF WISCONSIN
) ss.
WINNEBAGO COUNTY )
N pp
Personally came before \9�,Ab m i day of 3 �� ,-2025, the above named -nti��. C-�--%C.0 , to "
me known to be suc\4*XW3 * y ;red the foregoing instrument and acknowledged the same, for the purpose herein
contained.
®.8�y '.to
s'tLt
y VIO Z Public, State of Wisconsin
X •. O `� My Commission expires: q V kO J•o 3-5
For the City of Oshkosh: 1iii�N1111W``������
Rebecca N. Grill, City Manager Diane M. Bartlett, City Clerk
STATE -OF WISCONSIN )
ss.
WINNEBAGO COUNTY )
Personally came before me on this day. of U v� 2025, the above named, Rebecca N. Grill and
Diane M. Bartlett, to me known to be the persons who ecuted-the foregoing instrument and acknowledged, the-:
same.
Notary blic,.State of WiscWsou
My Commission.expires: -
Approved as to form:
j
PorensonT,Attom4eyL_
This document was drafted -by:
David J. Praska .
Deputy City Attorney
Oshkosh; =WI54903-1130:
4
June 18, 2025 .
EXHIBIT. A
LEGAL DESCRIPTION
The SWIM of the S W 1 /d of Section 33. Township IS North, Range .I G East, in the Town of Algoma. Winnebago County,
Wisconsin. excepting therefrom the four following described imcts of land:
I. Commencing It Southwest corner of said SW 1/4: thence East, along the. South. lisle of said SW 114.2 rods. thence
Northwesterly to the Northwest corner of said SW 1/4 ofthe SWl/4: thence South, along the West line orsaid SW1/4 of the
SW 1/4..10- the 'place of beginning..'
2. That portion thereof lying South and East of the Northwesterly line of the former right of wav ofthe Chicago.'Milwaukee, St.
Paul and Pacific Railroad.
3. 'That portion thereof heretofore conveyed to Winnebago County by Deed recorded. in Vo1..107.1. Pg. 447.
4. That portion thereof heretofore conveyed to the Slate of Wisconsin; Department of Transportation by Deed recorded as Doc.
No. 12,18967.
Tax Parcel No.002-0413
Property Address: 25i0 Clairville Road, Oshkosh, WI 54904 (for informational purposes only)
EXHIBIT A (1 of 1)
4 10 0 e 1I8IHX3
1111111 141111 1
000,_.fmo - -cum- -,Mamo qodou� I I I "All
69,
zz_
F
-7, [,,1
V A
0i
g0z-
A a V#_
N,
KA.
M
iflkgn'o.tR' .__-_ n jA jC3Yu, ���I
IT
1! It V
T.
Ml,Wll .1 ,rW_,
0 ",.- 1� ".1--lall....1-ac = -1 E '.., , g
NO - v
..........
401,
ij
.40,
4
F
Nm1*r)r)MpRi;:r
RR
V p
e I vi I'
y? ..............
A I
V11,
A
gi
M,
Pf x a �hllz
g g/ spa a
W 'I
\y
W1, "'Vfi—,"
Oil
J w:
�
Ir
, gv.
9
M.,
1)L
TI:
CD
N
Own
..... .....
4
lzr
�.q;;
co
2XI
. . . . . . . . . .
%mum, IN-
..........
........... ...............
�Tvo q X is
m inlo II
i., P
41
UZ
q 2 . M
CM E.glmemg
COOPERATING
land SurveyingUNITED
Landwapa AICNIMCMe
25SO CLAIRVILLE ROAD
TOPOGRAPIUC SURVLY
CITY OF OSHKOSH
041
Ulm
WZNNBBAGO COUNTY, WISCONSZN
Inspection &-Maintenance' Log
Catch Basin / Proprietary Device
Inspection: Year: .
Name of Site: Address:
Inspector: Company: .
Municipality
Contact: Phone:
*Facility owner is responsible. for inspecting, maintaining, and repairing facility components'after any
major storm event and,at the beginning of the Spring and Fall seasons. Check any deficiencies noted.
and comment for maintenance actions taken, date of repair, and any alerts. Inspection items with no
* should be completed by a qualified professional, every five years (or more frequently if concerns are
noted)..
** Please refer.to the.Maintenance at a Glance sheet for.more information. .
Inspection Item**
Storm
Date
Storm
Date
-Storm
Date
Maintenance Action
Date
Catch -Basin / Proprietary Device
Inlet Protection *
Remove after.
Stabilization
Debris / Trash Accumulation_* - -
Clean-up/Remove
Abnormal water levels *
Contact Municipality.
Sediment / Floatables Accumulation.*
Remove (pump. and
dispose of at
wastewater treatment
plant) **
Depressions around facility
Contact Municipality
Joint Separation -
Contact Municipality,
Cracks in Concrete
Contact Municipality.
Deteriorated piping..
Contact. Municipality..
.
Displacement of Structure
Contact Municipality:
** Pumping Details (based_ on design guidelines):
Type of unit(s) Design Pumping Frequency
Dates Pumped
Pumper Disposal Location
Page 1 of 1
EXHIBIT C (1 of 5)
.Rev. W12212008
i
Inspection &: Maintenance. Log
Detention Basin
Inspection Year:
Name of Site:.: Address:
Inspector: Company:
Municipality
Contact: Phone:
* Facility owner is responsible .for inspecting, maintaining; .and repairing.facility components after any .
majorstorrri event and at the beginning of the Spring and Fall seasons. Check any deficiencies noted
-and comment for maintenance actions taken. date of repair, and, any alerts. Inspection items with no
* should -be completed by a qualified professional every five years (or more.frequently if concerns are
noted).
Inspection. Item
Storm
Date
Storm
Date
Storm
Date
Maintenance Action
Date
Pond .
Bank Erosion
Debris / Trash Accumulation "
Visible.pollution
Abnormal water levels
Sediment Accumulation
Depressions, Whirlpools, Sinkholes
Embankment
1. Upstream. Slope- Poor Grass Cover*
Erosion or Slides
Trees/Brush.Growing on.Slopes '.
Deficient Riprap Protection
Animal Burrows*
Depressions or Bulges
Settlement .
Longitudinal Cracks
Transverse Cracks-
Inspect_ ion & Maintenance .Log
Detention Basin -
Storm Storm Storm.
Inspection Item DDate Date Maintenance Action Date
ate
2. Crest — Settlement
Misalignment
Cracking
3. Downstream Slope - Poor Grass
Cover*
Erosion or.Slides
Trees/Brush Growing on Slopes
Animal Burrows
Excessive or Cloudy Seepage
Longitudinal Cracks
Transverse Cracks
Depressions or Bulges
Settlement
Seeps, leaks, -or boils
Page 2 of 4 Rev..02/22/2008
EXHIBIT C_ (3 of 5)
..Inspection Item
Storm
Storm
Storm
Maintenance Action
Date
Date
Date
Date -
4. Emergency Spillway - Exposed .
Fabric
Overgrown Vegetation
Erosion/Backcutting at berm or road*
Rutting. or pot -holes*
Obstructions or debris
Inadequate Riprap/Armor
Cracking
Slumping/Sloughing of. Embankment
Settlement
Spillway .
1. Eroding or Backcutting
Overgrown Vegetation
Obstructions with Debris
Excessive.Siltation *.
Slumping/Sloughing
Control Structure .
1. Inlet -Debris in Conveyance Area
Erosion or Undercutting
Stop -log deterioration / leaking
Joint Separation
Cracks in Concrete
Deteriorated piping
Displacement of Structure
Page 3 of 4
EXHIBIT C (4 of 5)
Rev. 02/22/2008
.2. Outlet = Erosion or.Backcutting "
Debris in Culvertor Trash Rack
Undermining/Scour
Inoperable control valve
Inoperableflap gate
Joint Separation
Cracks in Concrete
Downstream Area
1. - Erosion "
Debris -[Obstructions
2. Bridge / Culvert -Problems
Buildings Issues
Foundation Concerns
Page 4 of 4 Rev. 02/22/2008
;EXHIBIT C (5 of 5)