Loading...
HomeMy WebLinkAbout0111965-Plumbing (laterals)OSHKOSH ON THE WATER .lob Address 10 EVELINE ST Contractor FRANK CONTRACTORS INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MATTHEW H/STACY DODGE Category 401 - Residential-Exterior (laterals) Bathtub 0 Shower 0 Ejector/Grind 0 Whirlpool 0 Floor Drain 0 Water Soffner 0 Lavatory 0 Lndry Tray 0 LocalWaste 0 Toilet 0 Lndry Stndp 0 ClothesWshr 0 Res. Sink 0 Disposal 0 Bidet 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 No 111965 Create Date 12/10/2004 Plan Dip Well 0 F Prep Sink 0 Gar Drain 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Plaster Sink 0 Standp Rec 0 Surgeons Sink 0 Ice Maker 0 Use/Nature RELAY BUILDING SANITARY SEWER AND WATER SERVICE of Work Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 Relay 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 1-1/4" Plastic Lateral 1 Relay 0 0 0 0 Valuation $1,500.00 Plan Approval $0.00 Permit Fees $100.00 ~ Permit Voided Issued By Parcel Id # 0803860000 Date 12/10/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3044 OREGON ST OSHKOSH WI 54902 - 0000 Telephone Number 920-426-5661 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.