Loading...
HomeMy WebLinkAbout24-11 CO #1 (FINAL)_8-11-25TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #1 (FINAL) 1322 33RD STREET TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 24-11, awarded July 23, 2024, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($40,868.87) NET DECREASE TO CONTRACT ($40,868.87) SECTION I TOTALS BID TOTAL $950,664.00 $950,664.00 CO #1 ($40,868.87)($40,868.87) CONTRACT TOTAL $909,795.13 $909,795.13 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: AUGUST 11, 2025 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: C0E66156-949B-4C70-8A9A-639F831A8549 Contract 24-11 CO #1 (FINAL) 24-11 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $99,000.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 250.00 273.60 23.60 $5.00 $118.00 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 550.00 529.90 -20.10 $171.78 ($3,452.77) 1309 7" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 0.00 -50.00 $174.78 ($8,739.00) 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 0.00 -50.00 $174.41 ($8,720.50) 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specifie Square Yards 800.00 652.20 -147.80 $177.41 ($26,221.20) 1370 Turf restoration; complete as specified Square Yards 70.00 53.90 -16.10 $35.00 ($563.50) 1373 Replace and set CITY- supplied manhole castings and frames; complete as specified Each 105.00 104.00 -1.00 $175.00 ($175.00) 1374 Furnish and install concrete adjustment rings; complete as specified Vertical Feet 50.00 50.68 0.68 $550.00 $374.00 1375 Furnish and install rubber adjustment rings; complete as specified Vertical Feet 6.00 4.64 -1.36 $1,400.00 ($1,904.00) 1376 Tuck point manholes; complete as specified Each 10.00 9.00 -1.00 $300.00 ($300.00) Page 2 of 5 Docusign Envelope ID: C0E66156-949B-4C70-8A9A-639F831A8549 Contract 24-11 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 700.00 0.00 -700.00 $0.01 ($7.00) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 50.00 0.00 -50.00 $0.01 ($0.50) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 250.00 0.00 -250.00 $0.01 ($2.50) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 150.00 158.60 8.60 $15.00 $129.00 1510 6" concrete sidewalk /driveway/ramp with 3" CABC and grading; complete as specified Square Feet 100.00 115.00 15.00 $20.00 $300.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 4.00 8.00 4.00 $8.00 $32.00 1904 Remove and replace HMA pavement; including sawing; fine grading; turf restoration; and traffic control; complete as specified Square Yards 400.00 478.30 78.30 $145.00 $11,353.50 1918 Asphaltic cold weather paving; complete as specified Square Yards 150.00 0.00 -150.00 $0.01 ($1.50) 1930 Temporary cold mix asphaltic patch; complete as specified Square Yards 500.00 0.00 -500.00 $0.01 ($5.00) 2001 Furnish and install 8" storm sewer; complete as specified Linear Feet 10.00 17.10 7.10 $122.00 $866.20 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 5.00 12.00 7.00 $129.00 $903.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 15.00 13.00 -2.00 $139.00 ($278.00) 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 5.00 8.20 3.20 $154.00 $492.80 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 4.00 3.90 -0.10 $1,480.00 ($148.00) 2236 Furnish and install Type 1 inlet; complete as specified Each 2.00 1.00 -1.00 $4,087.00 ($4,087.00) Page 3 of 5 Docusign Envelope ID: C0E66156-949B-4C70-8A9A-639F831A8549 Contract 24-11 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 5.00 5.00 $95.00 2850 Connect to existing storm sewer main; complete as specified Each 7.00 7.00 $680.00 2852 Connect to existing storm sewer lateral; complete as specified Each 1.00 1.00 $245.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 5.00 5.00 $270.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 35.00 41.00 6.00 $277.00 $1,662.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 15.00 13.00 -2.00 $310.00 ($620.00) 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 25.00 28.00 3.00 $353.00 $1,059.00 3101 Furnish and install standard sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 68.00 64.14 -3.86 $1,650.00 ($6,369.00) 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 92.00 89.00 -3.00 $700.00 ($2,100.00) 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 25.00 33.00 8.00 $385.00 $3,080.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 12.00 14.00 2.00 $527.00 $1,054.00 3123 Reconstruct sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 83.00 79.98 -3.02 $1,700.00 ($5,134.00) 3160 Pour and reshape manhole bench; complete as specified Each 6.00 7.00 1.00 $550.00 $550.00 3212 Furnish and install 10" x 6" sanitary sewer factory wyes or tees; complete as specified Each 3.00 3.00 $1,167.00 3216 Furnish and install 15" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 0.00 -1.00 $1,859.00 ($1,859.00) Page 4 of 5 Docusign Envelope ID: C0E66156-949B-4C70-8A9A-639F831A8549 Contract 24-11 CO #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 25.00 27.00 2.00 $205.00 $410.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 5.00 4.50 -0.50 $100.00 ($50.00) 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 3.00 3.00 $60.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 1.00 1.00 $1,146.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 7.00 7.00 $1,300.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 3.00 3.00 $1,330.00 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 5.00 6.00 1.00 $1,434.00 $1,434.00 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 1.00 -1.00 $250.00 ($250.00) 3800 Abandon sanitary sewer manholes; complete as specified Each 3.00 1.00 -2.00 $1,850.00 ($3,700.00) 3892 Excavation special (sanitary); complete as specified Tons 50.00 0.00 -50.00 $30.00 ($1,500.00) 3974 Furnish sanitary sewer manhole grouting setup; complete as specified Each 16.00 20.00 4.00 $1,550.00 $6,200.00 3975 Furnish and install sanitary sewer manhole grouting; complete as specified Gallons 80.00 323.00 243.00 $10.50 $2,551.50 3976 Furnish sanitary sewer manhole cementitious liner setup; complete as specified Each 14.00 15.00 1.00 $500.00 $500.00 3977 Furnish and install sanitary sewer structural cementitious liner- PERMACAST by AP/M PERMAFORM; complete as specified Vertical Feet 100.00 114.06 14.06 $160.00 $2,249.60 SECTION I (BID ITEMS 1050- 3977) - SUBTOTAL: $35,318.60 ($76,187.47) NET DECREASE TO SECTION I: ($40,868.87) ($40,868.87)NET DECREASE TO CONTRACT: Page 5 of 5 Docusign Envelope ID: C0E66156-949B-4C70-8A9A-639F831A8549