HomeMy WebLinkAboutFEI Proposal - OPM Sawyer Window Carriage House Repair 04-30-25
FACILITY
ENGINEERING
Since 1996
2820 Walton Commons Lane, Suite 140 Madison, WI 53718 608.240.9110
www.facilityengineeringinc.com
Maintenance
Programming
Architectural
Engineering
Consulting
Building Envelope:
Investigation
Assessment
Design
Support
Energy Conservation
by Design.
April 30, 2025
Ms. Anna Cannizzo, Director
Oshkosh Public Museum
1331 Algoma Blvd.
Oshkosh, WI 54901
Mr. Jon G. Urben
Mr. Mike Blank
City of Oshkosh
215 Church Avenue
Oshkosh, WI 54903
Re: A/E Professional Services Proposal
Carriage House and Sawyer House Window Repairs
Oshkosh Public Museum
Dear Ms. Cannizzo, Mr. Urben, and Mr. Blank:
Thank you for the opportunity to provide you with a proposal for professional services. You have
requested this proposal for us to provide coordination, design development, construction
documentation, and construction administration for this building maintenance.
FEI’s capabilities will be heightened by Jessie Powers, Jessica Powers Design. Jessie is a designer
whose expertise is in restoration, rehabilitation, and adaptive reuse. She performs investigation,
evaluation, recommendation, and design of building spaces and components. She is a WI registered
interior designer. She specializes in layout and configuration of architectural space for integration of
technology, building code, accessibility and building systems into new, existing, and historic
buildings. She excels at historical research, interior space planning, finish materials, and equipment
and furnishing.
Based upon our discussion with you and our understanding of the project, Facility Engineering, Inc.
(FEI) offers you the following. We refer to Oshkosh Public Museum as The Museum and City of
Oshkosh as The City.
Proposal
FEI proposes onsite condition surveying, design development, and documentation suitable for
bidding purposes. Next, we define periodic scopes of work for maintenance and/or repair by
providing construction documents and construction administration. We will coordinate with the
Wisconsin Historical Society (WHS) to maintain historic register compliance. After the award of a
construction contract, pertinent construction documents and construction administration will ensue.
Docusign Envelope ID: 611AAC61-D654-42E5-BC8A-46DA6B6CCC53
Proposal – Carriage House and Sawyer House Window Repairs
Oshkosh Public Museum
Ms. Anna Cannizzo, Mr. Jon G. Urben, and Mr. Mike Blank
April 30, 2025
Page 2 of 3
2820 Walton Commons Lane Madison, WI 53718 608.240.9110
www.facilityengineeringinc.com
General approach
Initiation/Administration
Teleconference and/or in-person meetings with Anna and Mike to establish the project
scope, key issues, and priorities.
Coordination/management of project team (The Museum, The City, and FEI).
Pre-design
Condition survey and assessment on-site (one (1) visit):
o Visually inspect and photo-record sample conditions from interior space and exterior.
o Verify and record measurements of selected sample conditions.
o Sawyer House – perform inspection to locate and identify areas of deteriorating
fenestration. Conditions and repairs to be noted on drawings and specifications.
o Carriage House - perform inspection to locate and identify areas of deteriorating
masonry, stucco, wood, fenestration, sealant (including control joints) and paint.
Conditions and repairs to be noted on drawings and specifications.
Review meeting with The Museum and The City (via conference call).
Schematic Design
Review the program furnished by The Museum to ascertain the requirements of the Project.
Arrive at a mutual understanding of such requirements with The Museum and The City.
Provide a preliminary evaluation of the program, schedule and construction budget
requirements.
Review with The Museum and The City alternative approaches to design and construction of
the Project.
Review meeting with The Museum and The City (via conference call).
Design Development
Based on the approved Schematic Design and any adjustments authorized by The Museum
and The City in the program, schedule, or construction budget, prepare, for approval by both,
Design Development Documents consisting of drawings and other documents to repair and
describe the size and character of the Project as to architectural systems, materials and such
other elements as may be appropriate.
Review meeting with The Museum and The City (via conference call).
Bidding Documents
Review Design Development with The Museum and The City (via conference call).
Revise drawings and specifications per The Museum and The City.
Develop final drawings and specifications/project manual suitable for bidding.
Submit bidding documents to Wisconsin Historical Society for review.
Prepare Construction Documents.
Bidding
Contact potential bidders.
Submit bidding documents to The City for bidding coordination.
Facilitate Pre-bid meeting (one (1) visit).
Docusign Envelope ID: 611AAC61-D654-42E5-BC8A-46DA6B6CCC53
Proposal – Carriage House and Sawyer House Window Repairs
Oshkosh Public Museum
Ms. Anna Cannizzo, Mr. Jon G. Urben, and Mr. Mike Blank
April 30, 2025
Page 3 of 3
2820 Walton Commons Lane Madison, WI 53718 608.240.9110
www.facilityengineeringinc.com
Construction Administration
Observe construction and report its status (three (3) visits).
Conduct one (1) Punch List inspection (one (1) visit).
Provide Record Documents; turn over to Owner.
Compensation
Compensation is based upon hourly rates and related hours assigned to each defined task. Any
additional services beyond the scope of this proposal will be performed upon written authorization
and will be compensated at the hourly rates indicated.
Professional Fees
The fee for rendering professional engineering services as outlined above shall be billed on a Fixed
Fee basis with these limits.
Initiation/Administration $ 6,600.00
Pre-design $ 3,300.00
Schematic Design $ 4,000.00
Design Development and Bidding Documents $ 12,550.00
Bidding $ 4,700.00
Construction Documents and Administration $ 10,950.00
Reimbursable expenses (maximum) $ 1,500.00
Total Fee $ 44,250.00
Schedule
We understand that our agreement will not be forged until Fall 2025; however, we are able begin
field work late-Summer/early-Fall 2025.
General Terms
FEI shall be provided full access (with escort) to property interior for the duration of time
required to complete the work.
On-site observation(s) may be conducted at any time during normal daytime office hours.
FEI shall utilize information from previous work completed with The Museum. Additional
information may be required and would need to be provided by The Museum with regards to
building and construction, its repairs, and/or modifications made.
The Museum and The City will remove selected storm windows and make available for
inspection by FEI.
Hazardous materials consulting (e.g. testing, analysis) work is not included within the scope of
this proposal.
This list is not all-inclusive and is meant to complement any Purchase Order agreement.
If this proposal meets with your approval, please sign a copy and forward it to our office. Thank you
for this opportunity.
Sincerely,
Facility Engineering, Inc.
Daniel L. Maki, PE, BECxP, M ASCE
Principal Engineer
Docusign Envelope ID: 611AAC61-D654-42E5-BC8A-46DA6B6CCC53