HomeMy WebLinkAbout0111923-Building (roof)
No111923
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
ROCAL LLC
Job Address1667 W 20TH AVEOwnerCreate Date12/07/2004
DesignerContractorIMPRESSIVE ROOFING AND SIDING INC
Category141 - Exterior RemodelingPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitNot RequiredFlood PlainNoHeight PermitNot Required
Park DedicationNot Required# Dwelling Units0# Structures0
Commercial / Add 1 layer of roofing, over existing roof - total additional load being added is .6 psf - Any additional load requires further review
Use/Nature
prior to installation. NO STRUCTURAL CHANGES - only replacing small areas of existing roof deck where soft spots are encountered.
of Work
spots are encountered.
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$8,221.20Plan Approval$0.00Permit Fee Paid$68.00Park Dedication$0.00
12/07/200400/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1323180000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
PO BOX 2786APPLETONWI549122786232-1669
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
12/03/2004 15:00 9202321669 IMPRESSIVE ROOFING PAGE 01/01
+ • ���� � ��� �`�✓V L
�' �{j�s f�ie�' R�ti � I�C�cv /S �ir/�ia.T f,v� 4�''� I�vTT, vr5 p� .
�J'��J')'J i��� RUt7�0�I'� �r�� !S .aq�� p�sy r�
o Ua-- �'a���l�o� �. lo b�s �OG� yxs� sh�';'- =.31 z��s�
!00� r i� ��Olbs
10��
1 �
D
^�/
��D �, �6� �r. loo sy� �/�
�-ov` I�c�'T�r,�S �lvS c) �r0
. , �
.y 5 u-;�i ,� �
!�'SS.Y�
-�`�`"`� ��z'� /Z��/y �) z.o �r� - f�� .�}�rr.r� y�is �-i y
G�� -�wc�FZ��u— - ��-�r� �-�� ��m /S . �d �c
L.� -�-�., s�►� ►� `�.�� �., (.a� c�1,,r� �c_
v�- �� :.�� �g.
��